Min. number of participants: 15 pax / tour
Booking is possible on a first come first serve basis in the personal
registration record.
Thursday, 28 May (Parallel tours)
TT-1./ Budapest Metro stations of Line 4, Buda side – under
construction.
There are structure-ready 3 of five stations, where inner
structures are under construction. The other 2
station-structures are under construction. TBM-bored tunnels
between stations are ready. Depot in Kelenföld is under
construction.
Half day program.
TT-2./ Budapest Metro stations on the Pest side of the Line 4
– under construction.
All of five stations are under construction, under the
densely built-in narrow streets-area of the inner city. Special
technology needed, because of very old listed buildings are near
to the stations building site. Construction of TBM tunnels will
be arriving after May 2009, only.
Half day program.
TT-3./ There are 4 motorway tunnels in a
total length of 3 km
under construction by NATM tunnelling
method in loess soil on M6 motorway Szekszárd-Boly
section near town of Bátaszék. Tunnels are located on a 10 km
long subsection of motorway within range of a 5 km. Between the
tunnels viaducts are under construction will also be seen. Full day program by bus. Light lunch will be provided.
TT-4./ Underground disposal facility under
construction for storing low- and
intermediate level radioactive
wastes in South Hungary.
The exploration activities and the
implementation of facilities (the access-tunnel) will be shown. Full
day program by bus. Light lunch will be provided.
TT-5./ Budapest Metro stations on the Pest side of the
Line 4 – under construction
All of the five stations are under construction, under the densely
built-in narrow streets-area of the inner city: Keleti railway station,
Rákóczi square station.
This tour can be booked on spot, and will be departed in case of
significant interest. Half day programme. Departure at 8:00 in front of
the Congress Venue (BCWTC)
|